黄色三及片_全是肉的高h文在线看_把她操舒服了_天天射天天做

首頁 > 解決方案 > Case
解決方案 案例展示

Key project -Lhasa- Shigatse High-speed Railway

 
 

-Lhasa- Shigatse High-speed Railway is one of the important projects of the national "11th Five-Year plan" and "mid & long term railway network planning". It is also an important part of Tibet railway.     

The full line GSM-R wireless communication system adopts the BSCe3/GSM9000 type digital mobile communication base station subsystem equipment provided by Ticom Tech and KAPSCH, including 49 sets of online equipment GSM9000 base station, 1 set of BSCe3 base station controller, 1 set of TCUe code speed converter, 1 set of PCUSN packet control unit, and 1 set of OMC-R network management system.The whole line GSM-R digital mobile communication base station subsystem equipment had been officially put into use in August 2014. So far, the equipment has been running stably and reliably, the field strength has been well covered, and the network management system has run normally. All the functional indexes completely meet the relevant requirements of the former Ministry of Railways and the Ministry of Information Technology, thus ensuring the safe and efficient operation of Lhasa- Shigatse High-speed Railway.


 
 
 

上一條:Addisababa Djibouti Railway

下一條:Key project - Shanghai- Kunming High- Speed Railway (Hunan section)